Leading heat pump experts since 2004

12KW Heat Pump & Boreholes for a Renovation in Herts

Better Planet was instructed to design, supply, and commission a ground source heat pump, for this property in Hertfordshire in connection with a full renovation and extension.

As no gas from the grid was available a ground-source heat pump was the natural choice. With limited land available for horizontal ground loops, boreholes were the best option. Like for all our projects involving boreholes, we obtained a geological report from the British Geological Survey detailing the ground conditions.

This allows us to determine the correct depth of the boreholes. In this case, the heat pump needed to be supported by two boreholes, 113 meters each.

Location: Hertfordshire

Project Summary

  • A Nibe F1145-12kW ground source heat pump.
  • A 300-litre heat pump cylinder.
  • A 200-litre buffer tank.
  • Two boreholes, 113 meters deep.
  • Nibe Uplink allowing remote monitoring through the internet.
Jamie Greening Sales Engineer

Like what you see?

Get in touch with our team for further information and advice.

Contact us

Accreditations & Memberships

Like what you see?

Get in touch with our team for further information and advice.

Contact us
©2024 Better Planet

Want to find out more information?

Contact us